Answer / ahmad
No milk cant be used for concreting, because water is
required for hydration purpose which cant be obtained by
milk.
Is This Answer Correct ? | 25 Yes | 1 No |
Answer / dheeraj deshmukh
1)Yes We can Use milk for concrete, Milk is also performing
good hydration agent. but we can not use milk because it is
too expensive. rather that this we can get better and chiep
mix with water.
Is This Answer Correct ? | 5 Yes | 0 No |
Answer / sachin khairnar
no milk can not be used instead of water
Is This Answer Correct ? | 6 Yes | 2 No |
no milk is not used bcoz water is redues the hrat of
hydration proccses.
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / ramir v. agustin
Milk is too expensive my friend,if you want too attain
workability,water reducing,retarding and high range effect
on your concrete, use Type G admixtures.
Is This Answer Correct ? | 0 Yes | 2 No |
Answer / sanjeev kumar padhy
Milk can not be used in concrete because presence of
lactose in milk leads to serious chemical reaction.
Is This Answer Correct ? | 0 Yes | 2 No |
At what point does a circle start losing area when being flattened?
koi bta sakta ha ka steel ko calculate krna ka full mathod pls
How to decide the Lap Length in Steel Reinforcement
1m3 3/4 inch course agreegate concrete is which m3 of agreegate ?
Why do we not deduct steel volume to find actual volume of concrete in practical as we have studied that,,, actual volume of concrete = volume of column- volume of steel pls explain with reference of IS code?????
how many rod are needed in 99sqft room .
5 Answers Associated Construction Company,
Labor requirement for each item needed? Lean Concrete 103.550m3 Concrete for Foundation and Structure 1753.000m3 Expansion joint 288.000m Contraction joint 127.000m Dowel bar 450.000m
why the openings of sieves are square io size?
how to determine pile length and diameter of pile is there any thumb rule?
Which tests are performed on soil to decide the type of foundation to be provided.
How to layout the site plot ? Method with explation
why development length = 50D . why not 100D