hi friends
this is a newcomer in your community of enthusiastic
peoples.
i am preparing for SSC (CPWD JUNIOE ENGG EXAM FOR
ELECTRICAL)
pls guide me on the same how to crack it? PLS LET ME KNOW
IS ANYONE THERE WHO PASED IT? CAN I GET THE QUESTION PAPERS
OF PREVIOUS EXAMINATIONS?
No Answer is Posted For this Question
Be the First to Post Answer
We are using 4 MVA transformer and we provided 2 separate earthing pit for Body and 2 separate earthing pit for neutral, can we connect separate body earthing pit to other earthing pit (Equipment earthing)?
what is polarity in ac system? and how do identified?
how to match 0 -10V with 4 - 20mA
A double circuit with dog conductor 66KV Transmission line from wind farm evacuation to feeding substation having capacity of 25MW for transmission. Can same transmission network be considered for further expansion of Power & how much in MW. If we need to expand next 10-15 MW more will there any augmentation is required in transmission network? Kindly reply asap.
what is rotor earth fault protection scheme in hydro generator & what is dc field flashing ?
I am getting above 60 V as open delta voltage against single phase unit ICT at tertiary delta formed and ICT getting trippped on NDR. ICT tested and found in order. PTs provided on tertiary are tested and in order. what may be the reason?
Main CT ration is 400/5, meter CT ratio is open type: -/5A. What is the Multiplying factor of the meter, considering same PT ratio.
Help need in transformer !? Hello Friends The parameters of 2300/230 v 50hz t/f is R1=0.286 ohm R`2=0.319 ohm Rc=240 ohm X1=0.73 ohm X`2=0.73 ohm Xm=49.2 ohm Secondary Load impedance ZL=0.387+J0.29 solve the exact equivalent circuit with normal voltage across primery.. I know every thing but i cant find CURRENT I1=? and I`2=? Please help me give solution or only Formula please please...
the power consumption of perminant magnet moving coil?
Which generation plant has instant start
How to choose the vector group for the step up and step down transformers??? Tell me the which vector group is suitable for step up and step down transformers and whats the reason to choose and whats the benefits???
How much area a lightning arrestor can cover?