Tell the details of the precommissioning tests that are
performed on distribution transformer, power cable and
switchgear (11kv).
Answer / subaharan
first check the transformer bushings and their condition,then
you meggering the transformer each phase to phase and phase to
earth.
power cable you check the high voltage test which is used for
measuring the leakage current,meggering and continuity
checking.
switchgear the same meggering,isolator checking,relay
testing(set various values of currents,voltages and set time
for tripping) make the fault and note the trip time.
Is This Answer Correct ? | 1 Yes | 0 No |
Explain the laying procedure and laying depth of submarine cables under sea?
can we apply kirchhoff's laws to circuits containing non linear elements?
What are the diferences between ELCB and RCCB
Explain Creepage Distance of Insulator
What are the operation carried out in thermal power station?
what is meant by reactive power ?
What are the site acceptance tests for power cables, DG Sets, LT panels & 30kVA UPS ?
In an electrical power supply,why if neutral phase of a 3phase supply fail over current occur but if it's single phase supply neutral phase fail low current occur?
What is a diode?
want happens when a dc is given to a commutator
what is specific gravity of a battery if specific gravity increase/decrease,what will happen to the voltage/current of the battery
What is pole of the system?