How can get electrical "c" licence.I am complited in
Deee.Passing year of 1993.Working in pvt cocern lt
Line.Please advise me .Cell no 9994786021
Answers were Sorted based on User's Feedback
Answer / hanison
I completed Apprenticeship training in TNEB and having 3 years maintenance experience. How i should apply for C license. Currently I left my Job.
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / shahul
First of all need to get self attested letter of concerned Government Electrical Inspector. My application got rejected due to this😒
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / n.angarasan
Form S for "C" License Application form. "C" Means Competency.
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / saravana
i am working 750 kva transformer in ht line last three years. but am diploma in mechanical engineering . please guide me anyone.
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / anandababu
I HAD COMPLIED DIPLOMA IN mechatronics engineering as i am working in maintenance department for last five years and what my doubts is i am eligible for to get a "c" licence at now
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / pandurangan
I am working 1.5 MWp solar plant and my designation site engineer in maintenance team..Is it eligible for c licences.
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / k.prabakaran
Hi sir iam complete DEEE 2015 3years experience for maintenance department for TVS company so how apply c license pls send details sir
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / ponpandiyan
how can get electrical "c" licence.i am complited in
DEEE.PASSING YEAR OF 2011.WORKING IN PVT COCERN LT
LINE.PLEASE ADVISE ME .CELL NO 8056783820
| Is This Answer Correct ? | 0 Yes | 0 No |
why we +ve load distribution in 24v and -ve load distribution in 48volt in the telecom sector.?
is it necessary for 200 kva transformer to have marshaling box and cu plate earthing for neutral
why voltage form factor of PT are increase , when it is ecpected heigher spikes in system. how it is calculated.
operating Lt & HT voltages used in India?
in the exciter the power is feeded from battry or control or whatever.and we need it in the generators for the stating . do we need it in the shutdown also?i mean the exciter>
A single line diagram(SLD) and a purchase order of a 11/66kV switchyard of a power plant was given. In the SLD, only one lightning arrestor(LA) was shown, but the purchase order had need of 3 LAs. Is this correct, if yes, why?
What is the technical name of minute currents that i have been produced in moving electrical objects?
How to write a progrramme to turn ON and turn OFF a motor with a single push button in AB?
2 Answers HCL, Torrent Pharma,
plz explain the snubber circuit unit
why transformer capacity is called KVA and motor capacity is called HP/KW? Why transformer capacity cant call HP/KVA?
You are of electrical field and you are going for software? Why
why impedance test in power cables?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)