At present how many HVDC lines are there in india
Answers were Sorted based on User's Feedback
Answer / starrajkamal
Hi i agree with the above answers.I have provided the answer
in a tabular format and also posted a video regarding HVDC
Link.Visit
http://online-electrical-engineering.blogspot.com/2012/01/hvdc-in-india-talcher-kolar-link.html
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / raju mondal
At present in india there are three operating HVDC
transmission lines(not including B-to-B)
1)Chandrapur(MAHARASTRA) to Padghe(MAHARASTRA, near MUMBAI)
(1000 MW at
±500 kV DC,800km)
2)Rihand(U.P.) to dadri(U.P.near to delhi)
(1000 MW at ±500 kV DC,900km)
3)Talcher(ORISSA) to kolar(KARNATAKA)
(2500 MW,±500KV,1367km)
Is This Answer Correct ? | 1 Yes | 1 No |
Answer / chittaranjan behera
Here is the list of the HVDC Lines in India.These data might be useful for the electrical engineers in answering the questions during interview.Cheers !!!
HVDC TRANSMISSION LINES IN INDIA
HVDC LINK NAME DESCRIPTION ABOUT HVDC LINK
Vindhyachal Back-To-Back link
connects Northern and Western regions with 2 lines.Transmission Power is 250 MW and the Operational Voltage is 70 KV
Chandrapur Back-To-Back link
connects southern and western regions with 2 lines.Transmission Power is 500 MW and the Operational Voltage is 140 KV
Sasaram Back-To-Back link
connects northern and eastern regions.Transmission Power is 500 MW and the Operational Voltage is 140 KV
Vizag Back-To-Back link
connects southern and eastern regions.Transmission Power is 500 MW and the Operational Voltage is 140 KV
Rihand-Dadri
Maximum Transmission Power is 1500 MW and the Operational Voltage is 500 KV.It is a Bipolar Link of length 814 KM in Uttar Pradesh.
Chandrapur - Padghe
Maximum Transmission Power is 1500 MW and the Operational Voltage is 500 KV.It is a Bipolar Link of length 753 KM in Maharastra.
Sileru-Barsoor
The Transmission length is about 196 KM and the Transmission Power is 400 MW and the Operational Voltage is 200 KV
Biswanath Chariyali -Agra
It is a bipolar Transmission Line of length 1825 KM from Assam to Uttar Pradesh.Maximum Transmission Power 6000 MW and the Transmission Voltage is 800 KV.
Talcher- Kolar
It is a bipolar Transmission Line of Length 1376 KM connecting Eastern and Southern regions . Maximum Transmission Power is 2000 MW and Opertional Voltage is 500 KV.
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / archana a
rihand=delhi power rating 1500MW
Talcher=kolar 2000MW
Ballia=bhiwadi 2500MW
Chandrapur=padge 1500MW
Bishwanath=agra 6000mw
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / ismail p
u dont kno how maney HVDC lines are there in india go guys
go & stude the sex books.......
Is This Answer Correct ? | 4 Yes | 6 No |
what are the types of control panel used in industries & all electrical purpose ?
HOW GENERATING END VOLTAGE LEVEL (6.6 KV/ 10.5 KV/ 11 KV/ 13.5 KV) DECIDED IN POWER PLANT. ON WHAT FACTORS THE GENERATING END VOLTAGE DECIDED, & WHAT IS THE CALCULATION USED FOR THIS.
what is residual current....
i want design of D.C.MOTOR 1HP 960RPM AND 2HP 960RPM ITS URRGENT
I Need standard operation procedure(SOP)for 500kva Oil type transformer oil filtration & Procedure for IR value checking.
Why machine give shock
Can a generator rated 400 V, 60 Hz be used in a 50 Hz System? Yes or No ? Why ?
How many types of losses occur in a transformer?
Which transformer is suitable for 220/11 kV, 60 MVA, distribution , Y-Y or D-Y or Y-D, give comparison for the same.
Why Transistors are not used as switching devices?
Name two low frequency oscillators?
differentiate between one way two gang switch & two way one gang switch, used in designing the loads of building.