Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


what are the basic parameters considered in designing a
pavement?

Answers were Sorted based on User's Feedback



what are the basic parameters considered in designing a pavement?..

Answer / mallikarjuna (nitw)

CBR Value(sub grade characteristics),Max.Wheel load,TRaffic
Density,Temp.variations

Is This Answer Correct ?    9 Yes 0 No

what are the basic parameters considered in designing a pavement?..

Answer / karrinr

1.CBR value of soil
2.Traffic intensity.

Is This Answer Correct ?    6 Yes 0 No

what are the basic parameters considered in designing a pavement?..

Answer / amit

The CBR has to be between 12 and 30 . Additionally ,
compaction prior to laying a new pavement is of great
importance . In case soil is Clayey , the whole area will
need to be excavated ,removed and replaced with sandy soil.
Traffic will undoubtedly play an important role and based on
CBR and Traffic Intensity , the apprpriate curve will have
to be selected. traffic intensity will be calculated for a
period of 20 years.

Is This Answer Correct ?    4 Yes 1 No

what are the basic parameters considered in designing a pavement?..

Answer / selvamani

CBR value,

Is This Answer Correct ?    2 Yes 0 No

what are the basic parameters considered in designing a pavement?..

Answer / dev

thicness of pavement(traffic intensity,max wheel load
etc.),no. of layers

Is This Answer Correct ?    2 Yes 2 No

Post New Answer

More Civil Engineering Interview Questions

Providing cement based water proofing treatment to terrace (Indian water proofing) with brick bats with cement morter (1:5) and (1:3). what are rate in cum or sqm.

3 Answers  


cross hairs in surveying telescope are fitted in the objective lense at the center of the telescope at the optical centre of eyepiece in front of the eyepiece

2 Answers  


please help me i want that steel bar weight kg/foot if anyone have formula so tell me .

3 Answers  


what is a weight of 10mm, 20mm, 40mm aggregate ?

1 Answers  


what is the weight of sand,corrse aggregate and steel,for 1cum

1 Answers   Gulf Asia, Jade Software, Sand,


The ff slab casted its thickness 100mm.2nd floor slab will be casting its 300 mm.how we shall be given suppot to that 300mm thk slab.ple way me

3 Answers   Brigade,


how do understand the plinth beam croos section diagram

1 Answers  


writte a c prog. to acept 5 no. from consule and then display them back on consulte in ascending order

0 Answers  


why shear reinforcement is not provided in the design of footing?

2 Answers  


what is daily progress of a steel fixer average how many kilograms he can fix in 8 hours average

1 Answers   Al Latifia Trading Contracting,


How find out Rolling margin of steel dia.wise?

3 Answers  


In a beam tension is always at the bottom but sometimes when we design using staad we get more number of rebars at the top compression zone Why?

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)