How to dimensioning SDCCH, LAPD and CS7 signaling on GSM?
Answer / samridhi singla
different signaling protocols are used between different
signaling nodes. Between mobile station and BTS LADPm
signaling is used . Between BTS and BSC LADP signaling is
used.Between BSC and MSC SS7 signaling is used. Signaling is
required to communicate the necessarily distributed function
entities of the network
| Is This Answer Correct ? | 13 Yes | 4 No |
instead of neutral can we use earth/ground to flow the current in the circuit
what is phase to phase to phase to ground fault
What is transient response?
How do determine the Size of a Droop Current Transfomer for Paralleling of Two Generators, Say I need a Droop Current transformer for a 600 kW generator need to be parallel with a 800 kW generator, etc.
2 Answers JK Cement, MPPGCL Madhya Pradesh Power Generating Company Ltd, PNG Power,
Is there any difference between circuit breakers and isolators
expansion of rccb
Pl. share your experience about industrial-electronics repair of machine tool.
What should be the amps for a MV fuses for transformer 630kVA 20(10)/0.4 kV
how CBCT works?
If only R Phase is connected in 2 pole elcb, n is not connected than it will work or not in ground fault.
when is safety goggles use mandatory?
what is the operation of regulator in fan?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)