Do you expect there to be many jobs for civil engineers
going into the future?
What are the three main drawbacks of being a civil engineer?
What are the three best things about being a Civil engineer?
What amount of vacation time is available to you?
Is the time paid?
What are the usual hours of work required?
Is it possible, or common, to work from home?
How much time do you spend on the site of your projects?
What type of schooling is required to be a civil engineer?
How many years are required to complete this education?
Answers were Sorted based on User's Feedback
Yes
THREE MAIN DRAWBACKS- WORK AWAY FROM HOME, COMPENSATION
COMPARITIVELY LESSER THAN THAT OF REMAINING ENGINEERS &
RECENT TRANSFERS/CHANGES OF SITES AS PROJECT COMPLETES AND
TO FACE DIFFERENT WEATHERS WHICH ARE AFFECTING HEALTH IN THE
LONG RUN.
THRE BEST THINGS - ADAPTABILITY OF THE SITUATION,GOOD
COMMUNICATOR WITH LOCALS WHERE EVER HE WORKS & CAN COMMAND
THE WHOLE MANPOWER WHAT EVER THE FIELD THEY BELONG TO.
NOT SUFFICIENT ;SOME TIMES IT ,AY BE PAID
7AM -4 PM
AT TIMES IT IS POSSIBLE
WHEN STAYED AT SITES ALL MOST 12 HRS PER DAY ACCORDING TO
WORK &REQUIREMENT.
SCHOOLING IN RURAL AREAS IS BEST TO GROW AS A CIVIL ENGINEER
21YRS
Is This Answer Correct ? | 14 Yes | 0 No |
Answer / concerned citizen
@ How many years are required to complete this education?
atmost 5yrs here in the philippines
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / shradhs
u cannot work from home..
just 4 years in India..
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / jyoti
1. yes Definately bcoz. life never ends the generation continues and so the desires of man to build structures of his own.........2. Less pay even if workd for day n night...more work.....less time........3.Good Experience practically.....working in natural and healthy environment.....4.No Vacation but the work itself is enjoying....5.9Hrs a day........6.Not every time, bbut some times it is possible.......6.office work....7. Anywhere further knowledge depends upon own interests.....8. Maximum 4 Hours
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / ajay
1)yes,
because , construction work every yr increase thus we hope in future many jobs create
2)a)fight with nature like rain wind etc
b)physical fitness required becoz we r work in field
c)
3)a)very most imp "jo pepar pr tayar hota h use hm field me banate h"
b)challenging work. (always learn somthing new)
c)work with natural substances
4)work is enjoyable thus enjoy with work (as a engineer we 3 moths very less work due to rainy seasons in this time structure work done very less , in this time like a vacation time)
5)as per requirement , generally 9am to 7 pm
6)no,because it is mental & also physical work
7)when the my worker and my foreman are satisfied our ans about the project work
8)theoretical is better than(lab, work physically etc) practical because every thing is visualize.
9) 4yrs
Is This Answer Correct ? | 0 Yes | 0 No |
Which is beneficial for shuttering a Plywood os accrow plate & why ?
what is the meaning fe in steel?
1 Answers Manjeera, Oceanus, PAN, URC Construction,
comparision difference between GSB and WBM subbase in road construction
a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.
why cracks are being developed in a structure? any specific reason? is there any remedial solution?
How and where from do we get 162 for calculating sectional weight of TMT
sir iam dng my engg final yr (civil) iam intrested to write group_1 .if we write this exam what kind of jobs we get and what should be the minimum score for us to get qualified and iam having reservation too.
04. a. Slenderness ratio…………… 1 b. If the height of a stage is 15-0 & dia. of the prop is 5, the slenderness ratio is….… 1 c. If the height of a stage is 10-0 & dia of prop is 3, the number of bracing will be…… 1
Plastering with cm 1:5 mix( one cement and five sand ) to 12 mm thick. How much Bag of Cement (50 Kg) and Sand (Cum)
In case of concrete cube test were all three molds are attached together do you cast your cubes simultaneously at the three molds every 50 mm or one after the other?
difference between specification and method of statement
1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.