How many grams per liter would there be in a 0.35 n (normality) citric acid solution?
No Answer is Posted For this Question
Be the First to Post Answer
ENGINEERING NUMERICAL METHODS - EXAMPLE 19.3 : There are 2 simultaneous equations : (A1) x + (B1) y = D1 and (A2) x + (B2) y = D2. (a) By using Excel program, find the values of x and y when A1 = 80, A2 = 150, B1 = 52, B2 = 100, D1 = 3.5 and D2 = 2.3. (b) Write the expression of Excel in the form of =MMULT(MINVERSE(W:X),Y:Z) in order to get the values of x and y. W, X, Y and Z may be A1, A2, B1, B2, D1 and D2.
Question 29 – For a Vernier scale that consists of 0.11 cm per section, estimate the length on actual standard ruler of 0.1 cm per section for 2.39 m and 0.91 m.
what is mean by refinery
What does the catalytic converter on an automobile really do?
Are some heat transfer services more prone to tube vibration that others for a shell and tube exchanger?
Question 40 - A stream with volumetric flow rate Q enters a cylindrical tank and a stream with volumetric flow rate q exits the tank. The fluid has a constant heat capacity and density. There is no temperature change or chemical reaction occurring in the tank. Develop a model for determining the height of the tank, h. Let V is the volume, A is the cross sectional area, r is the density, m is the mass, where V and A are for the tank, r and m are for the fluid. The rate of mass of fluid accumulation, dm / dt = (Q - q) r. Prove the model to be dh / dt = (Q - q) / A.
what is chemical engineering?
Define viscosity?
Explain the common failure mechanism for above ground atmospheric storage tanks?
what is the PH of earth? does earth is neutral like ph value 7 for water indicating water is neutral?
pleas tell me about chemical engineering apptitude test..
ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.28 : In the development of a small engineering facility for biochemical processing, completed contract method is applied in its construction accounting. In a short contract period, let the (contract price) = A. Let the (costs to date) = B; (estimated cost to complete) = C. (a) Find the values of : (i) estimated total costs; (ii) total estimated profit; (iii) percent completion to date. (b) If the project contract is 100 % completed : (i) find the total gross profit recognized; (ii) what is the exact numerical value of C?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)