What is hybrid foundation?
No Answer is Posted For this Question
Be the First to Post Answer
how much shouid be the rate for ready mix concrete per cubic meter
How to do rate analysis for concrete work including shuttering work?
0 Answers DBM, Techno Solutions,
2nd and 4rt angle elevation used in which country ?
What are the different types of runners?
what should be the strength of Concrete cube strength for 7 days, if the designed mix is M20?
12 Answers HPCL, Shrestha Civil Engineering Construction Company Pvt. Ltd, Sri Avani Projects, Tata Projects,
How to calculate concrete,s cement, sand, metal on the bases of its ratio. For any volume of work please give me brief calculation
how bitumen is prepared for NH,SH &other roads
What glue is least sticky?
what type pressure pipe use in sewerage & water supply?
16 questions out of 55 were from the book GUPTA N GUPTA OBJECTIVE of civil engineering. Total ques were 4 ques from hydraullics, 7 from BMC, 4 FROM SOM, 4 from soil mechanics, 6 from transportation, 5 from engineering drawing.
how can we find out the ratio of cement and sand in plastering
a sewer which receives the discharge of no. of house sewer is called house sewer lateral sewer intrcepting sewer sub-main sewer