What are the responsibilities of a construction manager?
No Answer is Posted For this Question
Be the First to Post Answer
i just want to know how much require sand and cement for 1 sq.mt including wastage. Please guide me as soon as possible.
about 200 cubic mtr
Spider cracks occur in beam bottom due to––
Ultimate strength to cement is provided by which chemical?
Why steel rods are produced only in even dimensions?
How to calculate the steel for 392c.meter*450c.meter rcc slab
what is flashing?
Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks
while measuring slab for concrete Quantity it is practiced that steel quantity is not deducted in that particular qty.why?
Which ratio use for cement selery???
what is the ratio of concrete to steel? what's its value??
for 100sft of Cement plastering ratio 1:6 How much quantity of cement and sand required.
6 Answers J.K. Organization, L&T,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)