i just want to know how much require sand and cement for 1 sq.mt including wastage. Please guide me as soon as possible.
No Answer is Posted For this Question
Be the First to Post Answer
what is the quantity of formwork in shuttering and barbending is done by 1 mason and 1 helper
how much sand requires for Light weight blocks for 100sqft
What is the life of anaerobic Digester if it is used for municipal solid waste digetion.
calculate the quantity of cement ,sand,bars and aggregate used for 28*4 ft with 4 inch (125mm) thick
What are the different approaches in designing the floors of the service reservoirs?
In IS:456-2000 the workability of concrete is given in mm (slump)in cl.7.1. In IS:10262-1982, cl.3.3.4 & table-6 says +/- 3 percent adjustment is required in the quantity of water (calculated as per table-4 or 5), for each increase or decrease in the value of compacting factor (i.e. workability of concrete) by 0.1. How it is possible to calculate the exact quantity of water required for a particular grade of concrete? What is the relation between Slump & Compacting factor of concrete?
how many labour is required for 1cum of concrete?
Which apparatus done steel (bar) tension test
where will u provide construction joint on slab?
What is a bearing capacity of soil?
what is a minimum strength recommented for aerocon blocks?
What is meant by struct column And stub column
3 Answers L&T, Shoba Devlopers, TATA,