How many mortar required for Brickwork of 1 Cu.m works??
No Answer is Posted For this Question
Be the First to Post Answer
How may digree of freedon in four bar chain.
a g+2 building having mezenine floor ,but stair is approching only 1st and 2nd floor, in this case stair is calculate in plinth area for mezenin floor or not?
If we don't have drawing for Excavation of building,At what rule we will go for excavation and how much depth will go for a villa?
Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft
Why the statue of liberty is made of copper?
what"s the abbreviation for P.C.C? what"s the formula to calculate 1m3 P.C.C consumption?
2 Answers ACIL, L&T, Punj Lloyd Ltd, Rajshree Construction,
As a site engineer what do you check in foundation before concreting
what is Quantity of stone and sand required for one cubic meter of stone work (UCR)
What is thumb rule in quality and quantity estimation of a Residential building??
0 Answers Ascent Constructions,
what shape of coarse aggregates are ideal for concreting?
what mean By core Billing
what is project planning
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)