What Is Pre- Commissioning Package +what is DCS & ESD Pre- Commissioning for Instruments Please explain your answer on practical ground base
No Answer is Posted For this Question
Be the First to Post Answer
Explain the difference between the types of input variables plc?
if we put any thermocouple on a table in a room without any connection,what temperature should it show.
Difine flashing , Cavitaion & Noise? how to minimize these effects
Someone Please tell me what are the Pre-Commissioning activities in a Thermal Power Plant for an instrumentaion Engg.
what will be the output of the temparature transmitter if temp is 120 degre celcius.
1 Answers Base Automation, NTPC, PDO,
What is difference between Isolator and Barrier ?
Why we. Don't measure current in parallel? Why we measure current in series and why we measure voltage in parallel only?
2 Answers Almeer Technical Services,
Full form of KKS when use DCS.
what is transducer?
i am preparing for BARC ,so plz mail me how to prepare for BARC. ALSO IF POSIBLE SOME RELATED QUESTIONS. MY MAIL ID IS khushi_4uall2003@yahoo.co.in
For crude application in floating roof tank, how to calibrate a DP Transmitter? How is the floating roof weight considered?
The company where I am working, their is rosemount 5400 series radar type level transmitter, it is meant to show level of filled tank, but along with the level it is showing temperature also, so my question is how a onon-contact type radar type level transmitter can show temperature even if it does not have any contact with the fluid?
0 Answers Process Control Technologies,