what is the ration of the dummy columns which are to be dismantled in reconstruction for laying original columns
Answer / suryanarayana
I think CC(1:5:10) with using 40 mm metal
| Is This Answer Correct ? | 0 Yes | 0 No |
What is the IS code for cube testing?
one MT of steel for using how much binding wire required?
In which code or text book can i get the reinforcement detailing for slabs, beams, columns.
1 m^ 3 of concrete 150 x150 mm of spacing of required of steel ?
What is the neutral axis depth factor formula
standared weighs for differnt grade of concrete
what is the type of earthing
WHICH KIND OF ADDITIONAL PILE DRIVEN TO INCREASE THE CAPACITY OF SUPPORTING LOADS ON VERTICAL PILES
How many Rod required for 58 feet by 24 feet roof slab which is supported by 5 * 3 = 15 Column. Six Stored building Roof Slab = ? Ton 15 Column = ? Ton Slab Beam = ? Ton
what is m30 in concrete tiles
0 Answers Interex, Raj Construction, Spago,
please briefly explain calculating or estimating steel quantity for a RCC column?
For removal of formwork of simply supported slab / beam from where to start the deshuttering? ( Max Bending moment of the simply supported beam is in the center hence is it required to start from the supports?)
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)