How can I make justification between using concrete grade c35 compare c37?
No Answer is Posted For this Question
Be the First to Post Answer
For Beam steel reinforcement detailing, in the End of the beam do the making of L shape in the rebar is essential in all the cases, specially in the ends of the Beam?
what is project?
What is binding spacing of the rebars at lapping zones.
How to defind P.C.C. mix design according ratio & IS coad
Cement sand mortar ratio 1:6 and 1:3. In canal lining 10mm & 16mm respectively done after 24hrs difference between them . Tell me Torrence limit of above ratio after 1 Year .
why cracks are being developed in a structure? any specific reason? is there any remedial solution?
how to remove the quantity of metal 1 and metal 2 in concrete
"Gates of the dams are generally designed of curved shape". Why?
what is the least count of staff ?
coarse sand has a fineness modulus in range of
What is the difference between the concrete mix design carried out by IS10262 and by ACI method ?
please i wont to know the full meaning of P V C
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)