Form S and "c" license application both are same? @ tneb portal


No Answer is Posted For this Question
Be the First to Post Answer

Post New Answer

More Electrical Engineering Interview Questions

explain in detail HV & LV bushing connection in power transformer (110 / 11 kv 16 MVA)

6 Answers   TNEB Tamil Nadu Electricity Board, wbsedcl,


Is there any question in the name of Static Switch in UPS??

0 Answers  


Why in power plant projects we see DOL starting method used for motors upto 160 kW instead of star delta method

0 Answers   UCC,


Grounding. Dear all at one of my site we checked the amps at the earthing cable to the alternator it was found 125 to 130 A. at the neutal cable in same machine found 146A. in the same plant checked the earthing current on other alternator it was 52A, and neutral 116 A. we are facing problems with our controller and the card was damaged once. can that neutral/GND current be a reason? as there is common grounding for the Alternator,Brkr panel,Transformer?

2 Answers  


why occ characteristics curve in not tracing back when we are bringing back the rhoestat?

0 Answers  






What is the difference between CRNO and CRGO in an transformer and what is the advantages of these two.

13 Answers   Anchor, CIL, ETA, Kirloskar,


What is meant by reverse polarity and how it can be fixed?

0 Answers  


How to define Kirchhoff current law and voltage law along with simply examples.

0 Answers  


primary of transformer connected to Dc supply in series with switch, and secondary connected on ammeter, what happens when swith On and OFF. (or) if continuously On and OFF

9 Answers  


What is the mmf,rgt and ngt please brief completely

0 Answers   cpgn,


Hi friends, i m electrical engineer i want a cdr for migration purpose so anybody have information about this then send me on jayesh_ee88@yahoo.com.please try to me

0 Answers  


Ceiling fan motor wiring Hi, I have 2 ceiling fans broken. The receiver/control units burned out due to lightening. One Harbor Breeze and one Hunter's I took them apart (remove receiver units). Now on both of the motor I see 4 wires coming out from each motor I really want to know the function of each wire. Are there anyway I can test to see which is which? After searching forums I know these 4 wires are from 2 sets of coils inside the motor, one is Start winding and the other is Runing winding I could not find the receiver/control unit any where, so I am planing to buy Capacitors and universal remote controls to make the fans run again. Anyone has any idea how to do the wiring, please help Thnks

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)