Q 1) 1 Mason and 2 LABOUR / _________CUM brick work
Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work
Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work
Q 4) 100 SQ FT roof slab concreting ____________mason and labour required
No Answer is Posted For this Question
Be the First to Post Answer
-what is the meaning of M.S.L for civil field? -what is the grade slab and suspension slab?
how to find steel quantity
What are the different types of pile founations used?
sir tell me what are the rules to find out the cut length? and what is the deduction in dia to be made ?
lap lenth
What are the tests required to check the Quality of steel?
what is the diffreance between 1 way slab& 2way slab?
What is capicity of cap lock scffolding stander(vertical member) and ledger of different size?
What is the difference between EPC,DBOOT and BOOT.
where the corner reinforcement be placed in the rigid road pavement? can it be placed below the bottom main bar of double netting pavement?
What is the difference between oneway slab and twoway slabs
Required Qty of Cement Mortor for 3"x3"x1' groove filling?