How To Measure Honey Comb Full Brick Work, Can we deduct Hole, If Yes, how to Calculate Rate Analysis



How To Measure Honey Comb Full Brick Work, Can we deduct Hole, If Yes, how to Calculate Rate Analysi..

Answer / bulusu v s n murthy

Brick work per sq.m required bricks with wastage 54 nos (half brick wall) measurement for total area. No dediction of gaps .in honey comb b/ w nos required 44 nos per sample with wastage,now calculate rate per brick with nos add for scoffolding,highly skilled Mason,semi skilled Mason, in skilled workers as per our rata analysis in brick work only d quantam of work we get half of half d B/W quantity.supose 2 skilled+ 2 semi skilled+ 4un skilled can do 10 sq.m of half brick wall per day in case of honey comb it is 5sq.m.if u satisfy give feed back

Is This Answer Correct ?    1 Yes 2 No

Post New Answer

More Civil Engineering Interview Questions

How do we calculate the power of centrifugal pump?

0 Answers  


How may digree of freedon in four bar chain.

1 Answers  


What is the difference between face reinforcement and distribution bar in a concrete structure?

2 Answers  


what is the procedure for flakiness and elongation index

1 Answers  


what is differences between ferrock and concrete ?

0 Answers  






why you have choosen civil engineering as a carrier ,what goals do u have and how you wil aschiene it?

5 Answers   L&T,


Camber of 15 mm is to be provided at free end of the cantilever what dose it mean??

1 Answers   MECO,


how much quantity of cement bags are required to fill the one m3 of empty container.?

12 Answers   L&T, NBDL, SEW Infrastructure,


What is the Maximum %age of Steel in columns and beams ?

0 Answers  


How do you calculate the surface area of the paver blocks, in oreder to find out the compressive strength of the same ?? And which codes are used for testing of paver blocks ?

1 Answers   BP Sangle Constructions, ECMAS,


what is the main difference b/w compaction and consolidation

2 Answers   KCP,


Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M hight 3.75 meter 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)