How To Measure Honey Comb Full Brick Work, Can we deduct Hole, If Yes, how to Calculate Rate Analysis
Answer / bulusu v s n murthy
Brick work per sq.m required bricks with wastage 54 nos (half brick wall) measurement for total area. No dediction of gaps .in honey comb b/ w nos required 44 nos per sample with wastage,now calculate rate per brick with nos add for scoffolding,highly skilled Mason,semi skilled Mason, in skilled workers as per our rata analysis in brick work only d quantam of work we get half of half d B/W quantity.supose 2 skilled+ 2 semi skilled+ 4un skilled can do 10 sq.m of half brick wall per day in case of honey comb it is 5sq.m.if u satisfy give feed back
Is This Answer Correct ? | 1 Yes | 2 No |
How do we calculate the power of centrifugal pump?
How may digree of freedon in four bar chain.
What is the difference between face reinforcement and distribution bar in a concrete structure?
what is the procedure for flakiness and elongation index
what is differences between ferrock and concrete ?
why you have choosen civil engineering as a carrier ,what goals do u have and how you wil aschiene it?
Camber of 15 mm is to be provided at free end of the cantilever what dose it mean??
how much quantity of cement bags are required to fill the one m3 of empty container.?
12 Answers L&T, NBDL, SEW Infrastructure,
What is the Maximum %age of Steel in columns and beams ?
How do you calculate the surface area of the paver blocks, in oreder to find out the compressive strength of the same ?? And which codes are used for testing of paver blocks ?
1 Answers BP Sangle Constructions, ECMAS,
what is the main difference b/w compaction and consolidation
Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M hight 3.75 meter 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks