How To Measure Honey Comb Full Brick Work, Can we deduct Hole, If Yes, how to Calculate Rate Analysis
Answer Posted / bulusu v s n murthy
Brick work per sq.m required bricks with wastage 54 nos (half brick wall) measurement for total area. No dediction of gaps .in honey comb b/ w nos required 44 nos per sample with wastage,now calculate rate per brick with nos add for scoffolding,highly skilled Mason,semi skilled Mason, in skilled workers as per our rata analysis in brick work only d quantam of work we get half of half d B/W quantity.supose 2 skilled+ 2 semi skilled+ 4un skilled can do 10 sq.m of half brick wall per day in case of honey comb it is 5sq.m.if u satisfy give feed back
| Is This Answer Correct ? | 1 Yes | 2 No |
Post New Answer View All Answers
1)Why we can use half brick in 4inch wall and 2)why not in 9+inch brick wall
What is c.g.i sheet which used for roof??
Civil engineering related
Explain moment of inertia and its importance.
what is the function of GSB all class ?
Explain the different types of roofing systems?
in 100 cft = 1350 bricks in 100 cft = ? bloks
In cement making,what is meaning of blend,fineness,density.
What goals do you have in your career?
why the cracks occurs in NP3 class Hume Pipe ? And what is bearing capacity of it?
How to calculate laplength for 3 floors
what is Brest Wall?
how ratio is calculated for any grade of concrete. for e.g. sppose M20 requires(x;y:z) quantity of cememt sand and aggregate.
what motivates you to do a good job
in a building why we are using T beams? why can i adopt beam bottom & Top level as same as slab bottom & Top level?