How To Measure Honey Comb Full Brick Work, Can we deduct Hole, If Yes, how to Calculate Rate Analysis
Answer Posted / bulusu v s n murthy
Brick work per sq.m required bricks with wastage 54 nos (half brick wall) measurement for total area. No dediction of gaps .in honey comb b/ w nos required 44 nos per sample with wastage,now calculate rate per brick with nos add for scoffolding,highly skilled Mason,semi skilled Mason, in skilled workers as per our rata analysis in brick work only d quantam of work we get half of half d B/W quantity.supose 2 skilled+ 2 semi skilled+ 4un skilled can do 10 sq.m of half brick wall per day in case of honey comb it is 5sq.m.if u satisfy give feed back
Is This Answer Correct ? | 1 Yes | 2 No |
Post New Answer View All Answers
beam length 73 feet 4 inch,width 01 feet,height 50 inch so every beam load how much? and what quantity of M.S ROD? both side ony two column in middle no column.pls inform me that this is stable or not ? and how much risk of this beam?
how to determine H- zone in a column? where it will occur?
Explain the design for rcc multi-storied building?
A roof has a U value = 0.65 W/m2 .C. Extra insulation is to be provided. This insulation has a thermal resistance = 1.5 m2"C/W. Calculate the new improved U value.
WHAT IS THE % OF CONCRETE WASTAGES PERMITED IN A LARGE PROJECT ? AND WHICH IS CODE TO BE REFERED.
What is absolute pressure? How absolute pressure is calculated?
What is the worlds largest concrete dam?
I was once rejected for US visa in early August. But now I'm going again for interview next week. What are the chances that I will faced the same VO????
Dear Sir, I work in hydro project. I want to hire Scorpio/ Bolero on monthly basis. But how can i justified its amount (Hourly basic). Please solve my problem
what is the specific gravity of rubble in plum concert
Process of pcc in wateredug
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
suppose that 156000 sq.ft rcc work builtup are.how many % of brick work to rcc work.
How to calculate(Thumb rule) the consumption of steel per cubic meter for different concrete members.
How to decide/consider the grade of bitumen for dbm.