how to identify np3 pipe and np4 pipe
No Answer is Posted For this Question
Be the First to Post Answer
Brick work how many days curing and at any concreting pl
fe415
how much weight of 20 mm aggregate in bras?
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
how to estimate plastering quantity if the given object is in circular. 12 mm thick both side 1:3 example= i have 8.15 m2 how to estimate quantity
Name the standard sand for concrete tests
how can i test sand on field in lebortry?.
How to calculate the cement, sand quantity for plastering? (10'x10')10mm thick ratio 1:5. wht"s the formula?
35 Answers Adarsh Developers, Amrapali, Ganesan Builders, MAHINDRA, NCC, Olympia Infratech, Omex, Ozone Group, Papni Associates, Perfect Arts, PPEC, Raj Construction, Ramky, Skyline Builders, VRR Builders & Developers,
howto calculate the quantities of material used in fly ash brick after finding the volume??
How much 1 cum of M15, M20 & M25 concrete weigh?
wat would be the probable interview questions and GD topics for IOCL exam?
What is M40 _ TOR - EQ and B.F.S
0 Answers Odisha Hydro Power Corporation, Ramky, Simplex,