Answer / prasadarao
generally socketing is boring further after the strata ia
hard rock generally socketing is done twice the diameter of pile
| Is This Answer Correct ? | 5 Yes | 1 No |
Answer / gangeyyo
In pile foundations, as we all know, the strength of the pile depends on two factors, namely end-bearing and skin resistance.. Thus, the skin resistance is the factor which depends on the Pile Socketing Length and thus it depends on the type of underground soil, estimated design load, number of piles in the pile group, reinforcement used.
| Is This Answer Correct ? | 1 Yes | 3 No |
what is 3.14 indicates for cutting length of stirrups
what is plate load test??
How much kg or MTs of steel is required for construction of the building of 1000 sqmt.
what is the amount of absorption of slurry in shuttering ply board. what is the amount of slurry leakage allowed for 1 m3 of concrete.
Formula for calculating the volume of bulb in underreamed pile
What is bmc stands for in bmc software?
What in bending moment, if a moment is free end of cantilever beam?
What is the mix proportion of m30 grade?
how can we calculate steel value, depending on load
How to calculate the compressive strength of 28 days of concrete where we have 7 days compressive strength?
how to calculate rate analysys of 1:6 plastering 10 sq m
How many modular bricks are required for 1 cubic meter of brick masonry?
14 Answers ITI, L&T,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)