Answer / madhusudhan
1+1+2=4
1/4=0.25x1440=360kg
Or 7.2bags per m³
For 1m³wet concrete you required 1.54x360kg=554.4kg cement
Or 11.088 bags
Is This Answer Correct ? | 0 Yes | 0 No |
what is meant by camber
what will happen if one could not properly follow the spacing of slab reinforcement bar?
0 Answers Yirgalem Construction,
Which code specifies the specification ofthe construction joints to be provided in the raft slab of a basement which is 6 m deep.what should bethe detail of such a joint?
what are the ffactors you considered choosing the course?
if 6.0M x3.0M Boat floating on water One person Sit on Boat Then the boat Sink about 15cm .Then what is the wt of person.
what is bolt value?
What's the expanded form for NMR?
the magnitude of the buoyant force can be determine by newtons law of viscosity archimidies principal principles of momemnt none
what is the basic fundamental of contouring?
what is the unit for sbc of soil
what is the anchorage length of reinforcement.
What is the primary difference between adsorption and absorption?