Tensional forces,
Tension is only valid in solid strings.
In tension, the force acting on the object is always outward from the object
Compressinal force,
In compression, the force acting on the object is inward to the object. It shortens the object.
Compression can be used to transfer force as pressure in hydraulic systems
| Is This Answer Correct ? | 12 Yes | 1 No |
Answer / hammad akhtar
If v apply force on any object,tension force varies outwards to the object.....
And on the other hand,compression force varies inwards to the object.....
Dt's it....
| Is This Answer Correct ? | 3 Yes | 1 No |
Answer / ankit kushwaha
If we talk about tension and compression force it may be described with many examples but in case of tension and compression zone which come together is basically describe On The Beam of any structure
Consider a beam which have applied by force on its and it's have a tendency to break first of all it will be get crack from bottom side of The Beam and compressed on the top side of It's which is known as compression Jone and there are a neutral axis where all force are zero which divides the compression and tension zone
| Is This Answer Correct ? | 2 Yes | 2 No |
1 building project (work in progress) and following are sum detail about his project 1) Using local rebar grade 415 2) Total built up area- 60000 sq.ft 3) Floors to be constructed – 21 storey 4) Estimated requirement of Steel per sq. foot – 7KG/sq.ft 5) Concrete grade – M35 6) Rebars mainly required (sizes)- 16,20,25,32 & (8 mm for stirrups) Wanted to ask u if this person uses 500D…what are the benefits he will be getting? Whether his per Sq. foot consumption can b reduce? If yes den around how much?
WHAT do mean by M-309
why we use minimum cement as given in IS mix design code
Formula of area of crane hook
by which IS Code bend correction is two times of the dia meter of steel is taken
what is civil engineering?
2 Answers CPWD, drda, Jal Nigam, NHPC, Uttar Pradesh Jal Nigam,
How to calculate manhole brick work quantity.
1 Answers ABC, L&T, Renaissance International, RR Constructions,
how many days we should curing for plastering,brickwork,concrete?
10 Answers Al Faraa, Alfaraa, CCCL, Consolidated Construction Consortium Limited, Wipro,
Difference between wbm and gsb in road construction
4 Answers CPWD, GSB, Ircon, JMC Projects, L&T, RD,
How is rate analysis prepared for M 25 grade of concrete?
what is the minimum compressive strength of clay brick
0 Answers Ananya Construction Infrastructure, VNC,
I've 47'-6" x 89'-6" of flat RCC Slab 12mm dia 8" c/c. Please calculate the total weight of slab, weight of steel, and how much dead load it contains. Thanks
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)