Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


how to estimate plastering quantity if the given object is in circular. 12 mm thick both side 1:3
example= i have 8.15 m2 how to estimate quantity

Answers were Sorted based on User's Feedback



how to estimate plastering quantity if the given object is in circular. 12 mm thick both side 1:3 e..

Answer / sreejith

I will give the basic for calculating the plastering quantity for 100 m2.You can use the same way based on your required mortar volume

Let Area to be plastered=100 m^2
& Thickness of plaster= 12mm=(12/1000)m= 0.012m
Volume of mortar required= 100 x 0.012= 1.20 m^3
Add 20% extra mortar for filling joint,depressions and
wastage.

Volume of the mortar= [0.20 X 1.20]+ 1.20=1.44 m^3
[Wet Volume]

Increase further by One-third of the volume to get Dry
volume
Quantity becomes= [(1/3) X 1.44]+ 1.44=1.92 m^3

Summation of proportion=1+5=6
For 12mm plastering in 1:5 cement:sand mortar mix,

1)Cement required= 1.92/6= 0.32 cu. m
No. of bags of cement= 0.320/0.0347=9.22 bags
>>9 bags(say)
Kgs of cement required=9 x 50= 450 kg (approx)

2)Sand required= [1.92 x (5/6)]= 1.60 cu. m


[Weight of 1 bag of cement= 50 kg
Cement should be always measured by weight to avoid
variation.

One 50 kg bag of cement weighs 1440 kg/cu. m
Volume of 1 bag of cement= 50/1440=0.0347 cu. m ]

Therefore to convert Cu. m into No of bags of 50 kg
cement,just divide the volume of cement by 0.0347

Is This Answer Correct ?    5 Yes 0 No

how to estimate plastering quantity if the given object is in circular. 12 mm thick both side 1:3 e..

Answer / ajay patel

first find perimeter of cylinder that is (3.14 * D)
then multiplied by height of cylinder
do same for both side
you will ger ans in square meter

Is This Answer Correct ?    4 Yes 1 No

how to estimate plastering quantity if the given object is in circular. 12 mm thick both side 1:3 e..

Answer / hanamareddy maddur

01) volume of plaster=area of plaster*thickness of plaster=8.15*.012=.0978 m2
02) 20 % extra for joint filling &wastage=.0978*.2+.0978=.117m2
03) 1/3rd volume increase to get the dry volume=1/3*.117+.117=.156m2
04) sum of proportion-1:3(1+3)=4
05) cement qty=cement proportion*volume of mortar /sum of proportion
06) cement qty=1/4*.156=.039*28.2=1.1 bag
07) sand qty=sand proportion*volume of mortar/sum of proportion
08) sand qty=3/4*.156=.12m3

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

how many numbers of Precast concrete hollow blocks (400mmx200mmx200mm) can be installed by the one mason and two helper in one day.

2 Answers   Ircon,


Why did you choose to be an civil engineering

16 Answers  


how much CM required for Random Rubble masonry in CM 1:6

1 Answers  


Types of Bearings (Placed on Pedestrals) for Bridges? and mention the function of bearing?

1 Answers   DBL,


What is m & 20.& what is fe&415.

9 Answers   DLF,


how to calculate the no of cement bags required for 100sqft of area 12 mm thick plastering in proportion of 1:3,1:4,1:5,1:6?

1 Answers   Ajnara Group,


how many covering can be taken in the beam,column & slab also stair-case?

6 Answers  


What is the OMC and MDD for subgrade (soil),Granular Sub Base, wet Mix Macadam in your project?

2 Answers   L&T,


what is the meaning of TMT Bar and what is benifit of these Bars?

6 Answers   L&T,


How you read 5x3x1 #4 @ 20" 0/C in steel structure?

0 Answers   Ansu Construction,


Gidc technical que paper

0 Answers   GIDC,


Is it possible to make a feature using an overdefined sketch?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)