why the Steam Turbine(20MW)center line and gear box center line not in same elevation during coupling alignment ?
Answers were Sorted based on User's Feedback
Answer / dr.atul bansod
Elevation is given for compensation of natural sag of heavy rotors.Steam turbine manufacturer submits a document known as deflection curve for rotors. On that curve '0'point is specified (any bearing) and other bearings ar kept on different elevation with reference to this "0" refereed bearing.
| Is This Answer Correct ? | 3 Yes | 0 No |
Answer / rayudu thota
While rotation high speed shaft of gear box will lift by low speed side shaft due to the load on high speed shaft
Then it will come in to centre line after rotation.
| Is This Answer Correct ? | 1 Yes | 3 No |
Answer / amit singh
It will damage the shaft coupling and more even dangerous in running condition & JOP lifts the shaft not by weight u fool.
| Is This Answer Correct ? | 0 Yes | 2 No |
what is under voltage protection 27
what is actual CAL MODE & cal means?
why Subcritical has 60% condenser capacity
In a coal fired boiler furnace temp. is high but super heater out let temp. low what reason for this?
6 Answers ABB, Essar, Gayatri,
By any way can we increase the B check hours from 300 to 500
In one plant id fan and fd fan are used for boiler. boiler is used to heat water after some days they install one tank to heat water by hot flue gases coming out from boiler and then hot flue gases are used to heat the air coming from fd fan before leaving out from chimney . but hot flue gases are not coming out from id fan what might be the reason?
What will happen if the Air Preheater is placed before the Economiser?
6 Answers Bhel, KSPL, Tata Power,
what is need of primary water system in power plant?
what is the basic use of power plant in equipment
1. what is meant by burner tilting?
Qatar Fertiliser Company (QAFCO) Shortlisted me for interview (got the intel from my source) for Field Operator- Utilities post. Please let me know what kind of questions they asked? ... this position requires 5 years of experience in Power Plant and background Diploma in Electrical/ Mech. ... my Background is Electrical and I am a sub Assistant Engineer (Operation) at a private HFO based Power plant... PS: Please Let me know what preparation should I take to obtain the Interview which will be take place In Bangladesh soon
why expansion bellow is provided in between hopper and vessel in ash handling plant?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)