why the Steam Turbine(20MW)center line and gear box center line not in same elevation during coupling alignment ?

Answers were Sorted based on User's Feedback



why the Steam Turbine(20MW)center line and gear box center line not in same elevation during coupli..

Answer / dr.atul bansod

Elevation is given for compensation of natural sag of heavy rotors.Steam turbine manufacturer submits a document known as deflection curve for rotors. On that curve '0'point is specified (any bearing) and other bearings ar kept on different elevation with reference to this "0" refereed bearing.

Is This Answer Correct ?    3 Yes 0 No

why the Steam Turbine(20MW)center line and gear box center line not in same elevation during coupli..

Answer / rayudu thota

While rotation high speed shaft of gear box will lift by low speed side shaft due to the load on high speed shaft
Then it will come in to centre line after rotation.

Is This Answer Correct ?    1 Yes 3 No

why the Steam Turbine(20MW)center line and gear box center line not in same elevation during coupli..

Answer / amit singh

It will damage the shaft coupling and more even dangerous in running condition & JOP lifts the shaft not by weight u fool.

Is This Answer Correct ?    0 Yes 2 No

Post New Answer

More Power Plant Engineering Interview Questions

what is the relation between the grid voltage and generator voltage how to link up generator with grid

3 Answers   NDFL,


what is restricted earth fault explain in details

0 Answers   Greenko, JSW,


LAPT working in alternator / generator

0 Answers   Power Plant,


2. what is meant by exhausthood temp?

4 Answers   Alstom, ANG, GMR,


What is the use of Hydraulic Coupling in-between BFP pump & BFP Motor?

1 Answers   Lanco, XYZ,






.What is drip and drain.

2 Answers   NPTI,


why seal air fan is used and where it is used and where is suction taken from

7 Answers   Bhel, ETO,


DCS marshaling Cabinet Power supply can be replace during plant running time? Answer Yes it is possible. I am talking about the controller and cards power supply modules. They are always redundant and connected through diode so that if one power supply fails the other can take the charge immediately.so it is possible to replace one of them in running plant if the other one is healthy. MY question is how switching done.

0 Answers  


What is difference between Actual Drum Level and Compensated Drum Level?

2 Answers   DVC,


During shutdown of Steam Turbine,How do we cross the critical speed?

7 Answers   OPG, Power,


what is the difference between kg/cm2 to MMWC

2 Answers   Ansaldo,


What is tripping relation between the turbine exhaust pressure and turbine last stage pressure....???

1 Answers   Jaypee,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)