In Pressure Sfety Valve(PSV) 2" by pass line why given for process units.
No Answer is Posted For this Question
Be the First to Post Answer
how can we calculate reflux ratio? what is difference between internal reflux and external reflux?
How 'saltation velocity' is used in designing pneumatic conveying systems?
What is the symbol of sodium?
What is critical radius of insulation?
what is first order of reaction?
BIOCHEMICAL ENGINEERING INSTRUMENTATION - EXAMPLE 29.4 : The resolution of separation, Rs for chromatography is given by the formula Rs = (difference in retention time) / (average width at the base). In a chromatogram, 3 peaks a, b and c are found. Average widths W at the bases of the solutes are : Wa = 20 s, Wb = 40 s, Wc = 30 s. Resolutions of separation, Rs for solutes b and c in comparison to a are 2 and 4 respectively. The differences in retention times T for b and c in comparison to a are (Tb - Ta) and (Tc - Ta), Ta = Tc - Tb : (a) Form 2 equations involving Rs as a function of Wa, Wb, Wc, Ta, Tb and Tc. (b) Find the values of Ta, Tb and Tc.
To how much height the liquid willbe thrown out to atmosphere from a pump with a discharge pressure of 5bar
GENETIC ENGINEERING - EXAMPLE 27.2 : (a) Three genes, I, J and K are available. All these genes are linked with respect to one another. If the percent recombination between I and J is 8 %, that between J and K is 10 %, and that between K and I is 18 %, what is the order of the gene? (b) Twenty six genes, a, b, c, d, e, f, ... x, y and z are available. All these genes are linked with respect to one another. If the percent recombination between a and b is 3 %, between b and c is 3 %, between c and d is 3 %, ... between w and x is 3 %, between x and y is 3 %, between y and z is 3 %, then what is the percentage recombination between b and y?
ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.28 : In the development of a small engineering facility for biochemical processing, completed contract method is applied in its construction accounting. In a short contract period, let the (contract price) = A. Let the (costs to date) = B; (estimated cost to complete) = C. (a) Find the values of : (i) estimated total costs; (ii) total estimated profit; (iii) percent completion to date. (b) If the project contract is 100 % completed : (i) find the total gross profit recognized; (ii) what is the exact numerical value of C?
what is isochronus and droop speed?
What is higher heating value and lower heating value? Is it positive or negative?
Please convert 1 kg (mass) of Liquid LPG into Ltrs (volume) of LPG Vapor.