Answer / manu varghese
M20 RATIO=1:1.5:3 TOATAL=5.5
1/5.5*50=9.091CUM
9.091*1440=13090.908KG
13090.908/50=261.8=262BAG
| Is This Answer Correct ? | 2 Yes | 0 No |
Answer / krishanu
I think 50m3 concrete volume is the dry volume of concrete. So wet volume of the concrete is 1.54x50=77m3
for M20 concrete the aggregate ratio is 1:1.5:3
1. So, cement required= (1x77/5.5)=14m3=14x1440=20160kg=403.2 approx 404 bags
2. sand required = (1.5x77/5.5)= 21 m3
3. stone chips required = (3x77/5.5)= 42 m3
| Is This Answer Correct ? | 3 Yes | 2 No |
For M20, Ratio 1:1.5:3
So , 1440/3 =480[cement bag 1 nos =50kg], 480/50=9.6
9.6*1.25 [1.25=1 cft]
cement = 12cft per m^3
sand = 9.6*1.5 [1.5=ratio] =14.4cft
aggregate= 9.6*3 [3= ratio] =28.8cft
| Is This Answer Correct ? | 1 Yes | 1 No |
Answer / puneet agnihotri
for M20,ratio is 1:1.5:3
so,x+1.5x+3x=50
5.5x=50
x=9.09
cement:9.09m^3
sand:13.635 m^3
aggregate:27.27 m^3
| Is This Answer Correct ? | 3 Yes | 4 No |
Answer / falji chaudhary
for m20 ratio 1:1.5:3 use by 50 cum
Cement 320 bag
Sand:39 tone
aggregte 56 tone
Water 9000 liter
| Is This Answer Correct ? | 0 Yes | 1 No |
how to calcalate for roof beams & slab reinforcement design specified?
Generally construction is based on which method:limit state of working stress
3 Answers Mars Planning Engineering Services, Sterling Wilson,
How can we calculate 8- storied Madrasha Building pile capacity by taking SPT value at site?
1 Cum Brick Work CM 1: 6 - How Many Bricks ,sand,Cement Required? Brick Size 9" 4.5" 3"
48 Answers Alcove Infrastructure, Anantha Infra, L&T, Microqual, Shoba Devlopers, SSC, UltraTech, Valdan, VVA Developers,
indiploma civil engineering student r studied is456-1978. but in practicial we r using 2000 version i think 1978 version didn't use the student. any openion?
How to calculate strirubs hook length? one of my friend said unit of steel*dia of steel*no of bend=hook length is correct r wronge
What is most important to learn in Civil Engineers? AutoCadd,Staad, or Primavera...
1.what is the main responsibilites of Site Engineer ? and what are main attitude ?
hide face come to omegle.com ful fill ur desires
9. What have you done to improve or develop your knowledge / professional qualifications in the last year?
WBM Road aggregates quantity calculation
What is "L" provided at the base of column??
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)