where do Tie beams used in foundations?
Answer / nitin
The tie beam is used if the gap between the plinth level and footing is more than 2 meter ( depends on longitudinal ratio )
| Is This Answer Correct ? | 4 Yes | 2 No |
Please let me know about answer for my Question as "What is the maximum wastage allowable of HYSD Steel in any Bridge project as per Code and Code reference also ?
0 Answers Amit Enterprises, ICT,
what is the technical word for column and beam joint
how many express way in india
What is the quantity of cement in mix m20 concrete?
How to preparation billing for high rise building? anyhow can give the tips
why we use aggregate,sand with cement in concrete?
RCC MEANS
Grades of concrete
28 Answers Mittal Steel, UNOPS,
what is the compresive strength of m20 concrete at 7 day
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
what is the spacing required for chairs for reinforcing in raft footing.
how to calculate valuation for the old building?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)