How many cement sand ballast in cc 1:4:8 40mm
No Answer is Posted For this Question
Be the First to Post Answer
internal dia of sewer pipe should not be less than A] 15 cm B ] 20 cm C ] 25 cm
How to calculate the material for pile 450 mm dia & 300 mm dia with formula find Cement = ? Sand = ? Blue metal = ?
Kindly tell me a book name to study for BIS exam
What is IS ?
consumption of cement in p.c.c. a. mix. 1:1:2 b. mix. 1:1.5:3 c. mix. 1:2:4 d. mix. 1:3:6 e. mix. 1:4:8
How to calculate sand , cement quantity for 23mm thk brick work(10x10)
technical name of shuttering plywood
plz answer the questions, How do you check the quality of foundation? and What is the key performance area in quantity survey?
How do you prepare Material Recovery Statement for deduction from contractors bills?
Any bopdy tell me how to prepare rate analysis for Centering and shuttering for RAFT FOUNDATION, SUSPENDED FLOORS, STAIR CASES, RETAINING WALLS, SHEAR WALL and COLUMNS
in BUILT UP AREA BASIS WHAT IS RATIO OF CONCRTE & STEEL RATIO MAY BE CONCIDER IN PER SQFT QTY
for construction of 1 cum of brickwork what is requirement of cement, sand and bricks
3 Answers Nirman Consultants, Shapoorji Pallonji Group(SPCL),
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)