What is the cost difference between site mix and ready mix concrete per cubic meter
No Answer is Posted For this Question
Be the First to Post Answer
What is quantity of Cement and Sand required for the 1 cum brick masonry with 1:6 Ratio cement mortar.
2 Answers RPP Infra Projects, SIL,
What letter follows after these, O, T, T, F, F, S, S, E, __?
How will you provide reinforcement from corrosion?
At which place Construction joint should provide in slab and Beam at the time of casting.
What is the ratio of cement,sand,aggregate of mix m25
What is the FE 250 structural steel of 8mm tk plate testing sample intervals with IS code or international code?
0 Answers GVR, Howe Engineering, L&T,
How do i calculate material requirements for various concrete ratios, brick masonry for 1 cum?
the amount which paid to contractor before starting work. what does it calls?
what is the weight of concrete for 1 cum?
15 Answers Dhenu Infrastructure, L&T,
If a slab concrete is placed with M-20 grade concrete, actually it has to be placed with M-30. what are the rectifications / measures to be taken after concreting is done.
10'0" × 10'0" Proposed room Start and Finish How many Cement & Sand & Bricks & Metals & Steels Need
how i can tak Quantity of mortar in block work
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)