how i can tak Quantity of mortar in block work
No Answer is Posted For this Question
Be the First to Post Answer
Explain the various methods of concrete curing?
What is minimum tensile strength required for structural steel works ?
How many types of stirrups are there? How to calculate their cut lengths?
how to convert kg/m3 to cu ft
what is kribs is supporting?
what is means of M50,M20,M15 like this please tell me ?
how tl calculate lap lengh of concrete in different grade of concrete.
how the sand fail?
Two types of piling
Which factor affects the use of GSB material for different types of road works? What makes a material suitable to use for GSB??
What is capicity of cap lock scffolding stander(vertical member) and ledger of different size?
For 1 cu m of concrete required 1.54 Cu m times dry volume. Pl give clarification of 1.54 factor
1 Answers RASA, Unity Infraprojects,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)