what is mean by bleeding of concrete
Answers were Sorted based on User's Feedback
Answer / noman saeed
Bleeding of concrete means the separation of cement slurry from the concrete mass.Usually this paste comes on the top of the concrete surface or leaks through the pores in the form work.
Is This Answer Correct ? | 22 Yes | 2 No |
Answer / javed dawar
Bleeding of concrete occur due to excess of water ,by the excess of water the cementious material wash out. and due to this concrete lost their strength.
Is This Answer Correct ? | 4 Yes | 1 No |
Answer / mohit jain
bleeding is a form of segregation in which water tends to rise to the surface of freshly placed concrete. causes of bleeding of concrete are
high water content
poor mixing skills
Is This Answer Correct ? | 3 Yes | 0 No |
calculation of quantities of cement and sand in 1cum mortar with 1:6 ratio
What is the ratio of Grades M10,M15,M20,M25,M30,M35,M40.
69 Answers Ashoka Distillers and Chemicals, ATS, Bajaj, Black Stone, Concor, CTM, Gaurav Constructions, HARIOM TMT, Indian Steel, IT Systems, IVRCL, L&T, MB, RCS, Sandhya Constructions, SCSVMV, Shree Cement, Shyam Group, SK, Student, Synfra, UltraTech, UPCL, URC Construction, vvip,
please send me bhel questions on rupesh.017@rediffmail.com
How du we calculate dry cement (in Bags) for any concrete, also sand and aggregate? How many bags of cement does 100 cft of concrete 1:2:4 require? Procedure to calculate the required amount. Also if there is any easy thumb rule to find out.
How we decide the the load combinations for design of RCC structures?
What is bylayer?
What do you mean by bond? What are the different types of bonds?
How much material is required for constructing a 2 Lane 2Km rigid pavement road
how to calculate quantity of steel & concrete in stair case
7 Answers Al Fara, Indu Projects, Orbit Corporation, Shree Shakti Enterprises,
Required amount of Steel bars, cement/ square feet for roofing of residential building upto 3rd floor.
what is IS CODE in concrete tiles
difference between limit state method and working stress in terms of load