As per ratio 1:4:7, how can we calculate the quantity of materials for 1 cum of concreate, pls derive with equation
Answers were Sorted based on User's Feedback
Answer / snigda
Absolute Volume Method - 1:4:7
Material Wt of material per bag of cement Specific Gravity Calculation Absolute Volume of material
Cement 50 Kgs 3.15 50/(1000*3.15) 0.016
Fine Aggregate 200 Kgs 2.65 200/(1000*2.65) 0.075
Coarse Aggregates 350 Kgs 2.8 350/(1000*2.8) 0.125
Water 25 lts 1 25/(1000*1) 0.025
0.241
Assuming 1% air content 0.00241 Total absolute volume 0.244
Cement per cum of concrete 1/0.244 4 bags/ cum 205 kgs 0.14 cum
Sand per cum of concrete 4/0.244 16 bags/ cum 820 kgs 0.51 cum
Coarse aggregate 7/0.244 29 bags/ cum 1434 kgs 0.80 cum
Is This Answer Correct ? | 5 Yes | 1 No |
Answer / mkumar
ratio 1:4:7,
sum= 12
total vo. of ingredient of using= 1.57
1x1.57/12=0.1301m^3
0.00013x1440=0.1883kg
0.1883/50 =0.0037bags cement
sand- 4x1.57/12= 0.5233m^3
aggregate- 7x1.57/12= 0.9158m^3
Is This Answer Correct ? | 2 Yes | 0 No |
Whats the size cube
2 Answers Shimla Hills Construction,
What is Curtailing of R/F
How to calculate the force on a column of three story building. What should be the base concrete height?.
Why should appointment store person for project ? what is the benefits for company ?
how to calculate the required qantities of cement, Sand and aggrigate to prepare 1 Cum of concrete mix 1:2:4
what is the multiplying factor for diffrent types of pcc/rcc ratios?
Can compresive strength test for concrete at 1 day age possible to carry out? If yes, which IS code describes the procedure for such testing?
how inovative you are?...how do u define innovation?
need to join coaching institute in coimbatore tamilnadu ......say me the best coaching for IAS
where is dolpin pile is used
3 Answers IGCAR, Sekar Construction, Soba,
2. What are the advantages of your present job, things you like about it?
what is Quantity of stone and sand required for one cubic meter of stone work (UCR)