If do cube Test for 28 Days,when shall can do testing? after completion of 28 days it means 29th day or 28th day which one correct?   

Answer Posted / cherry

we have to calculate the date that the next day of cube catsting is.29th day

Is This Answer Correct ?    0 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How to calculate quanty of steel in four leg stirrups?

1458


sir iam dng my engg final yr (civil) iam intrested to write group_1 .if we write this exam what kind of jobs we get and what should be the minimum score for us to get qualified and iam having reservation too.

2407


Permissible wastage of cement as per IS code ? In which IS code I get it?

1215


please what is the number of bars required for a column of 6mx6m and 450mmx300mm,its a commercial building (Church)

1308


How to take labor charges for construction of 1cum of concrete?

686






What is the difference between Rock And Murrum. How to claim that excavated material is not a murrum but rock.

1989


How do you measure water flowing through 300mm diameter pipes?

710


How cracks in concrete can be avoided?

644


2nd and 4rt angle elevation used in which country ?

1837


how much quantity of 1.5" nails and 2.5" nails are required for conventional formwork shuttering?

1220


can stub column take the load as main column

1417


How do you calculate the power of centrifugal pump?

651


Types of column foundation and how to calculate its steel quantity.

1445


how to calculate the chair reinforcement length in slabs, footing or anywhere??

1884


by which materials we can prepare circular shuttering with tentative cost of material(rate analysis)

1695