How is calculate the cube molt
No Answer is Posted For this Question
Be the First to Post Answer
Why should you show Client/Engineer activities clearly on the project plan?
When you received a RA Bill of contractor at HO duly checked and certified by Site In-charge, How to know at a glance it is complete in order, do have any one checklist format in this regard.
Why do we use stirrups in columns?
16 Answers Rishi Infra Projects,
What is a hatch patterns?
What is the differential length of steel reinforcement? What is the over lap length of steel in different grades of concrete?
how many covering can be taken in the beam,column & slab also stair-case?
What is the least count of Theodalite survey?
what is the ratio of cement water and sand in RCC?
what is work of planning deptt. in any construction compny (in road project)
What are the reasons for geotechnical site investigations in uganda?
i know that, the for calculating material required for concrete volume of concrete is taken 50-54 % more for wet volume. i have querry is that cement and sand volume taken more for making wet volume but in the case of aggregate why it is taken more there is no change in aggregate whether it is dry or wet.???? can you give me answer for this???
what is the difference b/w GSB and WMM?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)