how many stones require for rr masonery work 1cum.
Answer Posted / santosh singh
For random rubble masonry work
1.25 cu m of stone is required per 1 cu m work
Is This Answer Correct ? | 24 Yes | 2 No |
Post New Answer View All Answers
cud any one send me tech quest paper(civil engg) at tarizus@yahoo.com
from where ican get sample papers for CET-delhi 2012
Define What is the best type of wood glue?
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting?
How much percentage of brick bats allowed in CD-75 bricks
what is modular brick and it size
What is the use of extruded feature in solidsworks?
What is the difference between a wood shake and wood shingles?
I am a civil engineering student and going to attend interview in this week in an IT company.Will they ask me questions about my area of interest or cs
Which code specifies the specification ofthe construction joints to be provided in the raft slab of a basement which is 6 m deep.what should bethe detail of such a joint?
how to calculate the dry wt of sand and cement for a required design mix?for ex:M20
what are the five benefits of using standard terminology in the measurement process?
How many are the types of joints?
What are the strongest shapes in building?
Scaffolding IS code NO.