how much steel used in 100 sq feet
Answers were Sorted based on User's Feedback
Answer / imran
Suppose Area of slab is 100Sq ft = 9.3Sq.m
Suppose Dia 10mm at 125C/C Bothways r/f Provided,
For 1 Sq. m Area No Of Bars = 1/.125+1=9Nos
For boathways = 18Nos
Length Of 1Bar =1m,For 18 nos = 18 m
Now For 9.3Sq. m Area = 18Nos x 18 r.mtr. = 324 R.mtrs.
So Unit Wt of 10mm Dia steel =0.62 Kg/m
So for 324 r. mtrs steel =324*0.62=201.5Kg Steel reqd of 10mm dia.
Is This Answer Correct ? | 23 Yes | 12 No |
Answer / imran
i hv no time for understood u at now.
but simply we know that.
per sft =1.5kg ROD NEED
so,100sft=100X1.4=???
Is This Answer Correct ? | 11 Yes | 5 No |
Answer / rajesh.d.v.s.p.
normal design per square meter of slab we take 15kg of steel
hear thay given 100 sq.ft
1sq.ft = 0.0928sqm
100sq.ft=.0928*100=9.2 sq.m
total steel requried = 9.2*15=138 kgs
Is This Answer Correct ? | 8 Yes | 8 No |
what ratio of cement and sand we used for making cover
How to compute minimum number of columns required for a site from area of site?
How many jacks and props required for one floor, or tell me any thumbrule...to know the approx jacks and props required.?
How much for the BRC lapping in full yield and half yield < and which table to get it ?
How may kgs. of sand make one brass ?
why moment is create in fixed beam. And why moment is not create in simply support beam
What is the difference between engineering stress and true stress?
What are the reasons for geotechnical site investigations in uganda?
what is tmc ,term is used in measureing water, pls tell me 1 tmc = how many litres?
18 Answers College School Exams Tests, Irrigation, IT Consulting Services, IVRCL,
Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.
what course did you consider thinking before you enrolled in college?
Why alternate bars are given bent-up in slab and how to decide the length of bent up?