1. HOW MUCH CEMENT AND SAND REQUIRED TO PLASTER 100 SQM
WALL.
2. HOW MUCH CEMENT AND SAND REQUIRED FOR SCREED WORK OF
AREA 30 SQM
No Answer is Posted For this Question
Be the First to Post Answer
i am completed my b.tech EEE in 2009,,,iam trying the job 3+ for AUTO CAD (ELECTRICAL),, what is the market for autocad electrical in hyderabad... how to handle the intervws give some suggestions ?
test procedure of fly ash bricks as per code
How can explode a block?
what is the type of earthing
1m3 3/4 inch course agreegate concrete is which m3 of agreegate ?
In colomn reinforcement when dia of bar is going to change, than what should be the lap length of bars weather it should be of heigher dia bar lap length or it should the accordance with new dia bar. the grade of concrete is same.
how can calculate qty of steel required for one or two ways slabs..
a g+2 building having mezenine floor ,but stair is approching only 1st and 2nd floor, in this case stair is calculate in plinth area for mezenin floor or not?
what is the max. and mim. height of vertical post in informatry sign board which is used in highway projects.
Define What are the reasons for geotechnical site investigations in Uganda?
What is Critical path in Ms-Project ?
Cement , sand , concrete ration in M30 Grade
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)