Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


Following test should be conducted to find out relative
polarity of transformenr terminals
A no load test B back to back test
C phasing out test D none of above


No Answer is Posted For this Question
Be the First to Post Answer

Post New Answer

More Electrical Engineering Interview Questions

america 60hz electric supply is used; but india it is 50hz; why? and if we use 60 hz supply what changeg has to be done or all the equipment has to be thrown which has rating of 50hz frequincy

1 Answers  


what is the defination of electrical engineer.

33 Answers  


how we can adjust for three phase motor cold stall time ,hot stall time and thermal register set up?

0 Answers   OPS,


Which state of India had first started power reforms?

1 Answers  


Can we put 3 layers of cable tray while installing tray

0 Answers   NTPC, Siemens,


what is eddy current loss?

3 Answers  


I completed my BE EEE degree 2006 .... which license should i apply .... ?????

0 Answers   Real Estate,


in 3 phase (4 wire) star connection - is current pass through neutral??

7 Answers  


what is High resistance grounding and whatis the criteria for the selection of High resistance grounding

1 Answers   MAHINDRA,


why no load characteristics of generator also called as occ

1 Answers  


what happens when we give ac supply to the dc motor?and why?

4 Answers  


SUPPOSE A CIRCUIT BREAKER HAS TRIPPED THE THE LINE WHEN A FAULT OCCUR ON IT.NOW WHEN THE FAULT HAS BEEN CLEARED, HOW THE CIRCUIT BREAKER WILL CLOSE AUTOMATICALLY NOT MANUALLY.

6 Answers   Bureau of Energy Efficiency, DVC,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)