How to calculate the quantity of cement in Cement Mortar M10
Concrete using 40mm metal
Answer / sjtbehera
M10- 1:4:8
Cement = 15.2/1+4+8=1.17 cum
3.4 bag
Sand- .46 cum
Agg. - .92 cum
Is This Answer Correct ? | 6 Yes | 9 No |
what is cross hair cursor?
if 20mm & 10mm coarse aggregate we have consider same prapotion than how to analysis m25 concrete
why cutting length in design of beam is rounded more for -r/f & less for for +r/f
Of all curing compounds available, can they use compounds with micro silica in lieu of water? Why?
1 Answers Saudi Aramco Shell Refinery Company SASREF,
what is formwork in construction
what shape of coarse aggregates are ideal for concreting?
BASIC DIFFRANCE BETWEEN LIMIT STATE METHOD AND WORKING STRESS METHOD?
ground floor columns and beams are reinforced by 4 Num's 16MM @ Corners AND 2 Num's 10MM @ centre.... And the nxt top floor columns and beams were lapped by 8 num's 12MM dia bars..... IS THIS CORRECT ????
What out turn civil works
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
how to prepare the bar bending schedule for a given rcc material?It will be more helpful if you explain me with an example?
what is called the inverd level of mabhole chamber?