ground floor columns and beams are reinforced by 4 Num's 16MM @ Corners AND 2 Num's 10MM @ centre.... And the nxt top floor columns and beams were lapped by 8 num's 12MM dia bars.....
IS THIS CORRECT ????
Answers were Sorted based on User's Feedback
Dear Sir, I work in hydro project. I want to hire Scorpio/ Bolero on monthly basis. But how can i justified its amount (Hourly basic). Please solve my problem
pls tell me , what is the water content
How to calculate carrying capacity of the existing water supply trunkmain
PLS.......... ANY ONE CAN FORWARD ME PREVIOUS QUESTION PAPER hpcl civil engg
why steel is used in rcc columns? what is its purpose?
How will we calculate the number of cement bags in 6 foot by 6 foot footing?
What is the permissible limit of silt contain in sand for rcc Work?
What is meant by Friction Pile?
1) why bent up are provided at l/4 or l/5 distance not at l/8or l/10? 2) why extras are provided in beams at top and why upto 0.3l distance max.? 3) why chairs are provided in two way slab?
How to find the volume of wood(tree) from its height and circumference.(circumference-6'5" and height 3'2")??
how many area req.in 15000liter water tank
Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required