What is the order of MIX Design of concrete?
a)Cement :Stone:Sand
b)Cement :Fine aggregate :Coarse Aggregate?
Answers were Sorted based on User's Feedback
Answer / abdul majeeth
(b)Cement :Fine aggregate :Coarse Aggregate
Is This Answer Correct ? | 7 Yes | 1 No |
what is the maximum percentage of crush sand in mix design.also what is the difference betweeen grite powder & crush sand.
2 Answers TATA, Vastu Kirti Enterprises,
a)tell density of steel , concrete, bricks , sand and aggregates.? b) what is knife test for wooden doors ? c) what is the meaning of term abrasion? what is tested in it? d) why pile foundation is provided in BCS?e) By total station what activities can be performed and on what principle it works? f) what is creep?
Advantage of Aluminum form work in terms of activities can be skip and cost too
1) one brass of stone aggregate 20mm is good for how much sq.ft. work of concrete beam and 2) one brass of river sand is good for how much sq.ft. work of concrete beam . if ration is 1:4:6. at the same time how many bags of cement will be required for same work if each bag is of 50 kgs . please help me.
what is meant by MIS report
Can we apply curing compound on ceiling (slab Bottom)
how much weighs a square feet of slab of 5 inches thick
HOW TO CALCULATE THE CEMENT & SAND REQUIRED FOR 1SQM BLOCKWORK OF 200MM THICK?
08. 4 main points about check list for Shuttering works are––– 4 i) ii) iii) iv) 09. 4 main points about check list for Concreting works are––– 4 i) ii) iii) iv) 10. 4 main points about check list for Plaster works are––– 4 i) ii) iii) iv) 11. 4 main points about check list for Brick works are–– – 4 i) ii) iii) iv) 12. 3 main points about Project delaying factors are––– 3 i) ii) iii) 13. Write down 60-grade M.S. deformed bar specification. 3 14. 3000 psi concrete means: 1 15. 4 main points about methods of wastage control are–– – 4 i) ii) iii) iv) 16. 1 main point about reasons for your honesty is : 1 17. Water cement mixing in hopper less mixture machine is better than hopper mixture machine because: 1 18. 2 main points about your role during roof casting are–––– 2 i) ii) 19. a. The weight of 3333m deform bar of 24.5 mm dia is…… 1 b. The weight of 300 rft plain bar of dia 1 is……. 1 20. The types of slumps are––– 3 i) ii) iii) 21. 4 main points about the causes of cylinder failure are––– 2 i) ii) iii) iv) 22. Detection of a beam & a girder are–––– 2 i) ii) 23. Curing is needed for–––– 1 24. The types of slabs in respect of size & shape are––– 5 In respect of size: i) ii) In respect of Shape i) ii) iii) 25. The types of Column in respect of size & shape are–– – 9 In respect of size: i) ii) In respect of Shape: i) ii) iii) iv) v) vi) vii) 26. 3 field tests & 3 Laboratory tests of bricks are––– 6 Field tests: i) ii) iii) Lab test: i) ii) iii) 27. 2 field tests & 1 Laboratory tests of sand are––– 3 Field tests: i) ii) Lab test: i) 28. 1 field tests & 1 Laboratory tests of M.S rod are––– 2 Field tests: i) Lab test: i) 29. a. The % of water absorbs by brick chips: …………… 1 b. The % of water absorbs by Stone chips: …………… 1 30. In respect of design: 5 a. The % of strength gains by concrete in 28 days= b. The % of strength gains by concrete in 14 days= c. The % of strength gains by concrete in 07 days= d. The % of strength gains by concrete in 03 days= e. The % of strength gains by concrete in 28 days without curing =
how to prepare analysis of hire charges for 62.5 KVA generator
How to calculate strirubs hook length? one of my friend said unit of steel*dia of steel*no of bend=hook length is correct r wronge
what is chicken mesh?explain its use