Detection of a beam & a girder are––––
No Answer is Posted For this Question
Be the First to Post Answer
What the approval that owner will give to contractor during construction project period? What will the affect on project if delays due approvals?
how to caliculate required amount of cement and sand required for 1cu.m.
material required for construction of 1cu.mtr wall (Cement, No of bricks (Brick size 40cm x 20cm x 10cm),sand,Quantity of water
How many different between estimated quantity and practical work at site.
PL.tell me about civil engineering questions with answer
Hai, I have applied for APPSC AEE (I&CAD) post.I need previous AEE papers of civil engineering.I hope u will kindly consider this and send.
how many quantity of water use in 1cu.m. concrete
List out some of the software program that can be useful for architect?
WHAT IS DIFFERANCE BETWEN TOR STEEL AND TMT STEEL
Wat is the optimum value of tensile strength of concrete after 28 days?
Meaning of civil engg. in hindi
4 Answers NC Infracon, Reliance,
Manpower required for de shuttering of conccrete slab