Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


Characteristics of a model project are ––



Characteristics of a model project are –– ..

Answer / sjtbehera

1. Good enviornment
2. Good planning
3 good resources
4. Good cordination.

Is This Answer Correct ?    1 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

at what height brick masonr, block masonry & Concrete wall can construct in a day ?

2 Answers  


What Should be the CBR Value for Transported (Selected) Soil.whether it can be 5% or not ?

3 Answers   Jindal,


do aerocon blocks give more or less equal strength than that of bricks...?

4 Answers   L&T,


what is the difference between ribbed steel & tor Steel ?

1 Answers  


If in a structure, e.g, 20mm steel bar is not available and we use 16mm steel bar instead of 20mm bar, how can we calculate the no. of steel bars for 16mm diameter bar?

5 Answers  


what is box type waterproofing and how it is exsiccated and what is the method of doing box type waterproofing

0 Answers  


about higyway engineering

1 Answers  


How can i design the beam . Explain with one example

1 Answers   GMR,


What is the difference between lap splice length and development length of rebars?

4 Answers  


How bonding is done for composite massonary?

2 Answers   Tarmat Infrastructure,


how many kilograms of binding wire in 1 kilograms of steel bars

5 Answers   JMC, TATA,


What is the value of live load that should be incorporated in design of locker room and cash vault room while designing a building for commercial bank?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)