how lap length is increased with increase of Grade of steel?
Answers were Sorted based on User's Feedback
Answer / bilal ali khan
development length mostly used when beam bar are passing through column and are simply shown as ld+10d
for fe500 ld is
m40-36d
m35-40d
m30-46d
m25-49d
m20-57d
for fe415 ld is
m40-30d
m35-30d
m30-38d
m25-41d
m20-47d
Is This Answer Correct ? | 18 Yes | 3 No |
Answer / rajarshi basu
As per IS 456 : 2000, Page no 42 (Clause no. 26.2.1) development length Ld is given by
Ld = (ï¦ï€ªï³s)/(4*ï´bd)
Let ï¦ï€ ï€½ï‚ nominal diameter of the bar = 16 mm
ï³s = Stress in bar at the section considered at design load = 0.87* fy = 0.87*500 = 435 MPa
ï´bd = design bond stress = 1.9 MPa for M40 concrete (As per table 26.2.1.1 of IS 456 : 2000)
Also just below the table 26.2.1.1,it is mentioned that
For deformed bars the value of ï´bd shall be increased by 60%. Hence the value of ï´bd shall be 1.9*1.6=3.04 Mpa.
So development length of tension bars of 16mm dia (Fe 500) in M40 concrete is
= (16*435)/(4*3.04) mm = 572 mm
572/16=35.75 ~36
Therefore for M40 Grade of concrete=Developement length in tension=36 x d
where,d=dia of the bar
According to IS 13920:1993, Clause 6.2.5 it is also stated that
In an external joint,both the top and the bottom bars of the beam shall be provided with anchorage length,beyond the face of the column,equal to the developement length in tension+10 x bar diameter-Allowance for 90 degree bend.(Thats means now we have to consider the Grade of the concrete,in our case it is M40)
therefore for M40 Concrete, for an external joint anchorage should be ld+10d=36d+10d=46d
Is This Answer Correct ? | 10 Yes | 3 No |
afe or not
what is flexible and rigid footing?
0 Answers IBM, Wah Engineering College,
how do we calculate the quantity cement,sand, & aggregate for M20,M15 for 10cum.
7 Answers Opera, Raheja, Star,
For G+4 storied building having 76000 sft per each floor, can you prepare schedule in such a way that structure should be completed with in 41/2 months and finishing be completed with in 51/2 months?
In Earth work compaction How u calculate How many liters of water required,for compaction of ordinary soil for one Cu.m.
what will be price of 1:2:4pcc per kg?
0 Answers Intellect Engineers,
How we paste the Granite Slabs at External Wall?Is there any chemical compound material was using?
What is the difference between stress and strength?
How to find quantity of cement bags, sand, coarse aggregate, from 1m3 of concrete of m20 design?
What is structural frames or systems?
How do you calculate the power of centrifugal pump?
what are the types of dams