the volume of cement req for 70cum of brickwork in 1:6
cement mortar is approx is equal to
3cum
5cum
7cum
1ocum
No Answer is Posted For this Question
Be the First to Post Answer
five requirements of infill panels for walls?
What is the best design for building bridges?
how to frame the sentence in voucher pad ? Description : 1.Food Expenses during site visit 2.Stamp Paper approval expenses 3.Travelling expenses 4. sweet distribution
how new RCC roof joined with existing RCc roof
What is the Hardness of M-40 grade concrete, general and theoratical
what is differences between ferrock and concrete ?
what is mean by compressive strength
1.how to calculate 4*3 runner qty in cft. 2.how to calculate the nails qty.(column,beam,slab) 3.if any formula for binding wire qty calculation.
I need old MMUP exam question and answer for Civil engineering
what could be the production cost of 1 cum of concrete by CP30 plant
what is hydrostatic paradox?
how to calculate the steel?