for preparing 10cum of 1:4:8 cement concrete the
requirement of sand is
0.7cum
2.8cum
4.74cum
18.40cum
& how
Answer / engr.asad ali
we know that
Total wet volume of concrete = 10Cu.m
First we find dry volume
Dry volume = wet volume X 1.54
Dry volume = 10 X 1.54 = 15.4Cu.m
Determine sum of ratio = 1+4+8 = 13
And also we know that
Quantity of Sand = ration of sand X wet volume
-------------------------------
Sum of ratio
Quantity of sand = 4 X 15.4
-----------
13
Quantity of Sand = 4.738 Cu.m say 4.74Cu.m
Is This Answer Correct ? | 56 Yes | 4 No |
Anyone have sample questions for bhel please send me since Iam appearing for this exam. Kindly send this to my e-mail: nethaj_babu@yahoo.co.in
Suppose you planning to paint newly fabricated workshop building made of structural steel of 10 tons total mass. How many litters paint primer for 1 coat and 2 coat of top coat?
What is a projection line?
How to calculate the area of a irregular sized land in square feet?and what will be the total area of this land South-51.1ft , North-47.7ft , East-53.3ft , West-54ft ?please explain me how to calculate?
0 Answers AIZAZ General Contracting General Maintenance, GK Realtors,
What are the causes of failure of foundations and remedial measures?
how to calculate the loads on slab? what are the steps?
what is spacing of wallar support of 3m column. the thickness of column is 0.25 m.
Why should appointment store person for project ? what is the benefits for company ?
what isIS code no for preparation of BAR BENDING SHEDULE (BBS)
what is the creep in concrete
standared weighs for differnt grade of concrete
may i know the detailed description of cutting length