sir
my site not availabele 12mm steel
now if i use 10 mm how many spacing require for slab design
slab thk 200mm
footing, column,raft,wall
how can calculate
give me formula
Answers were Sorted based on User's Feedback
Answer / manoj
dear as you post your question is not complete.
First of all in any case as per 456:2000
The horizontal distance between parallel main
reinforcement bars shall not be more than three
times of the effective depth of solid slab or
300 mm whichever is smaller.
Let Consider 12 dia of steel @ 175 c/c
Now
A1/A2 = S1/S2
A1 is 12 dia of steel which have total cross section area 113.112 mm2 and S1 is spacing c/c is 175 mm
A2 is the steel which you want to replace have an cross section area is 77.55 mm2 and we need spacing for that.
113.112/78.55 = 175/?
and the answer is 121.52
say 122 mm c/c spacing
you can follow the same formula in any equation but with in norms.
| Is This Answer Correct ? | 3 Yes | 0 No |
Answer / mughalsab
when u design slab then what is the spacing according to 12mm steel?
| Is This Answer Correct ? | 0 Yes | 2 No |
If we buy crush sand for 3200/ Brass and cement for Rs350 /Bag and flyash 1200 / tonne....and my production is 230 Bricks per bag than how much cost is required for 1 flyash brick?
Labor requirement for each item needed? Lean Concrete 103.550m3 Concrete for Foundation and Structure 1753.000m3 Expansion joint 288.000m Contraction joint 127.000m Dowel bar 450.000m
why we put pocket in some structure instead of bolt.
12mm diameter iron bar having 1m length how much kg weighted ?
Why was the empire state building made of steel?
punj loyed and sapurjl palanjl
Is there is any formula for calculate the correct length of rebar while it bending in 45 degree/90 degree and cranking???
What is the use of offset command?
you are working as a QC in hihg rise building. when what"s ur responsibilities works?
how to calculate no. of bricks for 1 cft? how to calculate cement and sand in cft?
In case of a beam ,main steel is provided along the longer span because, bending moment is directly proportional to length but why in case of one way slab main steel is provided along shorter span while as bending takes place along longer span?comment
what is the ratio of cement water and sand in RCC?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)