Answer Posted / er. umesh sharma
frog is a depression on the top of the brick which acts as a key in between two courses of the masonry.It also show the manufacturer name.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
how to stop beam concrete between column
what will be price of 1:2:4pcc per kg?
How to determine dia of steel for use in column,slab etc. i mean how to calculate the diameter of steel which is to be used in structures.
Can someone please be curing period of the following according to IS codes Column beam slab brick masonry raft found. and also tell how many hours/day
What is the use of offset command?
Why Should Curing Not Be Done By Ponding And Polythene Sheets?
I need old MMUP exam question and answer for Civil engineering
Formula of mid span bar
How do you calculate the unit weight of concrete?
The concrete slump recommended for beams and slabs; is?
How to calculate the crank rod in slab
Explain what is alternate bid?
How can we convert weight batch to volume batch for m30 mix
we have a crushing plant and our product is experiencing flakiness and elongation over limit for granite. what is the solution to this problem? how can it be avoided and what to do differently? It is not ok for batching plants
What is limit state method and working stress method and ultimate method